Zohr
The Mediterranean's largest gas discovery, made by Eni in 2015 and operated through Petrobel; onstream since December 2017.
Learn moreEgyptian Natural Gas Holding Company

Projects & Activities
Turning discoveries into producing fields — fast, safely and for the long term.
Production
EGAS reviews and approves development plans, oversees the joint operating companies that run Egypt's gas fields, and works with partners to keep production flowing from both new and mature assets.
Joint operating companies such as Petrobel and Burullus bring together EGAS and international operators to drill, build and run offshore and onshore facilities. EGAS follows each project from concept selection to start-up and monitors reservoir performance throughout the field's life.
The Zohr super-giant went from discovery in 2015 to first gas in December 2017, setting a global benchmark for time-to-production. Today the focus is on new phases, subsea tie-backs and development drilling that add volumes quickly through existing infrastructure.

Milestones
0
Zohr discovered by Eni
0
Zohr first gas (December)
0months
Zohr discovery to first gas
0
Atoll onstream
Major fields
A selection of the fields that anchor Egypt's gas supply, developed with our international partners.
Drilling
Development drilling onshore and offshore offsets natural decline in mature fields and brings new reservoir compartments into production.
Tie-backs
Subsea wells and short flowlines connect discoveries to existing platforms and onshore plants, cutting time and cost compared with stand-alone developments — the model behind fast-track projects such as Nooros.
Processing
Onshore plants such as the Zohr gas plant near Port Said treat raw gas and recover condensate before delivery into the national grid.
Field lifecycle
Step 1
Appraisal wells and studies confirm the size and quality of the discovery.
Step 2
The operator proposes a development concept, reviewed and approved by EGAS.
Step 3
Wells are drilled and facilities built under the joint operating company.
Step 4
First gas flows to the plant and into the national grid.
Step 5
New phases, infill wells and compression extend plateau and field life.
Discoveries awaiting development and brownfield opportunities are open to qualified partners.